Physical Infrastructure Still A Power Play In Virtualised Worlds

Data Centre Infrastructure Management (DCIM) tools can provide this information up to overall IT management platforms, so that it can be correlated against the management of virtual machines.

Thinking modular

One of the latest trends is the move to data centres becoming modular. From pre-built stacks of physical and virtual equipment from the likes of VCE with their VBlock, through to IBM creating full ISO shipping containers of data centre kit. Whatever the size of the module, the main aim behind these suites of solutions is to speed up the delivery of the data centre resource to the customer.

As part of the modular design phase, all the aspects of power, cooling and support have to be thought about. This involves looking at how to make the best use of the space that is available, both around the individual racks of equipment and the overall space involved.

This is because space in these modular environments is limited, so making changes to the design is very difficult once it has been put together and fitted within the modular system. Think about the change management and delivery process required: if you are not 100 percent sure what your capacity and IT consumption habits will be for the next three years, then taking the modular approach might not be right for you.

Where modular designs can be used for greater power efficiency is where they are purpose built and developed to meet a specific need. This means that all the equipment is specified at one time, rather than growing up over time. Again, the opportunities are there to reduce power consumption and cooling requirements from the start, as well as taking out redundant power costs that reduce PUE.

The quantity of cabling used in these implementations can also impact the approach to cooling. If there is too much physical cabling running within the conduits, forcing the necessary cool air through them requires more power and additional cooling. This overhead can be reduced through more efficient cable routing in the first place. The growth of higher speed cable and fibre technologies like 40Gb and 100Gb Ethernet will also make this less of an issue in the future.

Whatever your thoughts about the future of IT, the foundation for successful projects that meet requirements is the physical infrastructure that underpins the hardware, software and data. By looking at how these assets are put together, power consumption and usage efficiency can and should be improved.

David Palmer-Stevens is the EMEA systems integration manager for Panduit

Page: 1 2

adminuk

View Comments

Recent Posts

LastPass Separates From Parent After Security Incidents

New chapter for LastPass as it becomes an independent company to focus on cybersecurity, after…

1 day ago

US To Ban Huawei, ZTE From Certifying Wireless Kit

US FCC seeks to ban Chinese telecom firms at centre of national security concerns from…

1 day ago

Anthropic Launches Enterprise-Focused Claude, Plus iPhone App

Two updates to Anthropic's AI chatbot Claude sees arrival of a new business-focused plan, as…

1 day ago

TikTok Viewed As Chinese Influence Tool By Most Americans – Poll

Most people in the United States view TikTok as a Chinese influence tool a poll…

2 days ago

Ofcom Confirms OnlyFans Investigation Over Age Verification

UK regulator confirms it is investigating whether OnlyFans is doing enough to prevent children accessing…

2 days ago

Ex Google Staff Fired Over Israel Protest File NLRB Complaint

Dismissed staff file complaint with a US labor board, and allege Google unlawfully terminated their…

2 days ago